Pullover with Cables

Published: 14/12/16
Category: Pullovers
Hits: 3676
Pullover with Cables

SIZES: 12/14

MATERIALS

Yarn: Angora 250 g (60% Mohair, 40% Acrylic, yardage = 550m / 100g), 1 pair quick knit needles size 6 mm.

Work with 2 strands of yarn held tog throughout.

Reverse stocking stitch (Rev st st): Work RS rows P and WS rows K.

Rib Patt: alt K2, P2.

On WS rows, work all sts as they appear.

Gauge:

Rev St st: 13 sts and 18 rows = 10 x 10 cm.

Cable Patt: 16 sts and 18 rows = 10 x 10 cm.

Back:

Cast on 62 sts and work as foll: selv st, 8 sts in Rev St st, 4 sts in Cable Patt, 16 sts in Rev St st, 4 sts in Cable Patt, 16 sts in Rev St st, 4 sts in Cable Patt, 8 sts in Rev St st, selv st.

Then inc 2 sts on each cable (with cable already having 6 sts) and work the 1st cable crossing on 7th row acc to Chart 1.

After that, work cable crossing on each 8th row.

Armhole shaping: When work measures 40 cm from beg, bind off 3 sts once = 62 sts.

Slip rem sts on a holder and put it aside.

FRONT

Cast on 62 sts and work as foll: selv st, 8 sts in Rev St st, 4 sts in Cable Patt, 13 sts in Rev St st, 10 sts in Cable Patt, 13 sts in Rev St st, 4 sts in Cable Patt, 8 sts in Rev St st, selv st.

For each small cable, inc 2 sts on 5th row = 66 sts.

Start crossing cables on 7th row: small ones acc to Chart 1, big ones acc to Chart 2.

For big cable, inc 4 sts on 11th row = 70 sts.

Work cable crossing on 13th row and then work crossings on each 18th row.

Armhole shaping: When work measures 40 cm from beg, bind off 3 sts once = 64 sts.

Slip rem sts on a holder and put it aside.

SLEEVES

Cast on 38 sts and work 20 cm in Rib Patt.

Cont as foll: selv st, 13 sts in Rev st st, 10 sts in Cable Patt, 13 sts in Rev st st, selv st.

On cable, inc 4 sts on 11th row = 42 sts.

Work the 1st crossing on 13th row.

At the same time, for sleeve slants, inc 1 st 3 times on each 18th row = 48 sts.

When work measures 56 cm from beg, bind off 3 sts once at each end = 42 sts.

FINISHING

Transfer sts from holder on circular needle: 64 sts of Front, 42 sts of Sleeve 1, 62 sts of Back and 42 sts of Sleeve 2 = 226 sts.

On rnd 1, work selv sts tog and beg from 2nd row, in these places, work 3 sts tog on each 2nd row (sl 2 sts tog kwise, K1, pass it over the slipped).

When piece measures 20 cm from beg, there should be 78 sts on the needle.

Cont in Rib Patt while dec 2 sts on 1st row = 76 sts.

Then work 20 cm loosely.

Bind off all sts.

Sew side seams.

pullover chart

Our website uses cookies to provide you with personalized information. For more information, see the privacy policy.