Oversized Raglan Pullover with Cables

Published: 02/11/18
Category: Pullovers
Hits: 5014
Oversized Raglan Pullover with Cables

Size: XL

Materials: 

Yarn: 600 g (50% Wool, 40% Acrylic, 10% Mohair, yardage = 400 m/100 g); one circular needle size 4 mm (US 6).

Rib Patt: alt K1, P1.

Basic Pattern: 

Work acc to сhart 1. Only RS rows are shown.

On WS rows work all sts as they appear.

Repeat Rows 1-2 throughout.

Front Pattern: 

Work acc to сhart 2. Only RS rows are shown.

On WS rows work all sts as they appear.

Repeat Rows 1-12 throughout.

Sleeve Pattern: 

Work acc to сhart 3. Only RS rows are shown.

On WS rows work all sts as they appear.

Repeat Rows 1-12 throughout.

Note:

Work top down.

Work raglan line in patt acc to chart 1 over 5 sts.

Instructions: 

Cast on 116 sts and work as foll: for raglan - 5 sts in Basic Pattern acc to chart 1, for sleeve - 18 sts in patt acc to chart 3, for front - 30 sts in patt acc to chart 2, for back - 30 sts in patt acc to chart 1.

Raglan Slants: Inc 1 st 32 times on every 2nd row each side.

Work increased sts in patt acc to charts.

When piece measures 25 cm from beg, work all pieces separately.

Slip sts of sleeves and front on stitch holder.

Cont working back in Basic Pattern acc to chart 1. When piece measures 44 cm from cast on, for rounding, at both ends bind off 1 st 3 times, 2 sts twice, 4 sts once on every 2nd row.

When piece measures 66 cm from beg, bind off sts.

Work center 46 sts of front in patt acc to chart 2, work rem sts in Basic Pattern acc to chart 1. 

When piece measures 44 cm from cast on, for rounding, at both ends bind off 1 st 3 times, 2 sts twice, 4 sts once on every 2nd row.

When piece measures 66 cm from beg, bind off sts.

Work sts of sleeve in patt acc to chart 3 and in Basic Pattern acc to chart 1.

For sleeve slants, bind off 1 st 12 times each side every 4th row.

When piece measures 55 cm from cast on, work in Rib Patt.

When piece measures 59 cm from beg, bind off sts.

Finishing: for band, work 4 cm in Rib Patt 1x1 along lower edge of front and back.

Sew side seams. 

Sew in sleeves.

Neck Band: Pick up selv sts and work 4 cm in Rib Patt 1 x 1.

pullover chart

Our website uses cookies to provide you with personalized information. For more information, see the privacy policy.